ONAN 5500 Installation. The wires are labeled on the harness as follows on a typical ONAN 8-pin wiring harness

ONAN 5500 Installation. The wires are labeled on the harness as follows on a typical ONAN 8-pin wiring harness Listed here are typical installation directions for the ONAN 5500 Gas/Diesel/Propane with a 8-pin generator wiring harness. Note: For action 7 you’ll want to buy 14-gauge wire that is electrical the run from our ShorePower track […]

haber açıklama vs...

ONAN 5500 Installation. The wires are labeled on the harness as follows on a typical ONAN 8-pin wiring harness

Listed here are typical installation directions for the ONAN 5500 Gas/Diesel/Propane with a 8-pin generator wiring harness.

Note: For action 7 you’ll want to buy 14-gauge wire that is electrical the run from our ShorePower track to your transfer switch.

STEP ONE:

Turn-off your generator AC circuit breakers to prevent disruption of coast power solution during testing and installation of ShorePower track.

STEP TWO:

Recognize the following 4 cables in your generator wiring harness.

Make use of a tape or label to mark each cable which means you won’t forget which wire is which.

The wires are labeled on the harness as follows on a typical ONAN 10-pin wiring harness

  • A – Ground
  • C – Start
  • E – Stop
  • F – Run

NOTE: The pin connections above are typical ONAN connections. Not all the ONAN generators have actually the exact same generator wiring harness connections as some might have been changed by the dealer or RV maker. Make certain you have actually correctly identified the 4 cables properly before proceeding with step three.

STEP THREE:

Connect one Posi-Tap to each for the 4 cables identified in step two.

STEP FOUR:

Result in the connection through the ShorePower track to your Posi-Taps (wiring harness) according to the wiring diagram supplied.

  • Green cable to E AVOID
  • Red cable to C BEGIN
  • Brown wire to A GROUND
  • Orange cable to FRUN

Be sure to link the correct cables to the wiring harness once we utilize red-colored cables more often than once.

On our installation picture we utilized wires that are white extend into the harness as a result of location of our unit. The closer the installation of our product to your wiring harness will assist you to utilize the provided wire that is 4-foot we offer.

ACTION 5:

  • Link the wire that is red the ShorePower Monitor (I3) to at least one region of the enable switch with the provided Posi-Lock or perhaps a crimp connector.
  • Link the next red cable (supplied in the zip-lock case) to another region of the enable switch. One other end of the wire that is red fundamentally link to your positive battery terminal.

STEP 6:

  • Link the red wire through the enable switch while the red cable from (L+) in the ShorePower track to your +12 VDC (Positive battery terminal).
  • Link the black colored cable (M) regarding the ShorePower track to ground (any steel on the RV).

ACTION 7:

Through the ShorePower Monitor Power Converter ( See wiring diagram B – Transfer Switch Connection):

You will need 14-gauge stranded electrical cable for the run from our product to your transfer switch.

  • Connect (L) on our MeanWell Power Converter to at least one region of the 110 Volts on the transfer switch.
  • Link the (N) on our MeanWell Power Converter towards the center connection (common) from the transfer switch

ACTION 8:

The ShorePower track & the MeanWell Power Converter should both have their green light in, if all of the cables, such as the cables into the transfer switch, have already been properly linked. .

  • To check the machine turn the ENABLE Switch ON and disconnect from shore energy. The light that is green the MeanWell goes down and in around 20 seconds our product will auto-start your generator.
  • Let generator run for approximately one minute then re-connect to shore energy and our product will immediately shut-off your generator in more or less seconds that are 10-12. The light that is green the MeanWell comes straight straight straight back on.

SIGNIFICANT NOTE: switching the ALLOW SWITCH On or OFF will not impact the green light on the ShorePower track or MeanWell. Those two light will always be on IF the ShorePower Monitor is properly connect and you have shore power. The ALLOW CHANGE merely allows or disables monitoring.

This is exactly what a typical set-up will seem like as soon as it is completed. You can view other consumer installation photos by clicking right right here.